Red Line Extension

Red Line Extension
LocationChicago, Illinois, U.S.
ProposerChicago Transit Authority
Project websitewww.transitchicago.com/rle/
StatusProposed
TypeRail rapid transit
Cost estimate$5.7 billion
Start date2026; 0 years ago (2026)
Completion date2030; 4 years' time (2030)
Stakeholders
Geometry5.6 miles (9.0 km) long
Footnotes / references
[1][2][3]

The Red Line Extension (RLE) Project is a rapid transit construction project that will extend the Red Line, a Chicago "L" line, south from the 95th/​Dan Ryan station to the future 130th station. The extension project, coordinated by the Chicago Transit Authority (CTA) as part of the Red Ahead program, is situated in the community areas of Roseland, Washington Heights, West Pullman, and Riverdale on the Far South Side of Chicago.

The extension project was conceived in 1958 as part of a then-proposed rapid transit line along the median of today's Dan Ryan Expressway, Interstate 57 (I-57), and the Bishop Ford Freeway (formerly the Calumet Expressway). Only the section north from 95th Street along the Dan Ryan Expressway, the Dan Ryan branch, entered service in 1969. After the branch opened, various proposals were made on extending the branch south from 95th Street.

The signage of a 2005 federal transportation legislation, SAFETEA-LU, allowed federal funding from the Federal Transit Administration's (FTA) New Starts program to be earmarked for public transit projects like the Red Line Extension. The CTA finalized the alignment of the extension in 2018, which will run along the rights-of-way of I-57, a Union Pacific Railroad line, and the South Shore Line.

The extension will be 5.6 miles (9.0 km) long and is expected to cost $5.7 billion; construction is scheduled to take place between 2026 and 2030.

Background

[edit]

Under the New Horizons program in 1958, the "South Side Rapid Transit" line was proposed to travel along the median of the then-proposed South Expressway from 30th to 95th streets. South of 95th Street, two branches were planned: an eastern branch to 103rd Street via the Calumet Expressway and a western branch to 119th Street via I-57.[4][5] The South Expressway, later named the Dan Ryan Expressway, fully opened in 1962.[6] However, the rapid transit line, named the Dan Ryan branch, did not open until September 28, 1969, and the line only went as far south as the 95th/Dan Ryan station.[5][1]

Planning

[edit]

Early extension plans

[edit]
I-57 (left) and the Bishop Ford Freeway (right) have wide medians that were intended to accommodate the proposed extension under the New Horizons program.

Despite the Dan Ryan branch terminating at the 95th/Dan Ryan station, proposals to extend the branch further south have persisted for many decades.

In accordance with the New Horizons program, the extension was originally proposed to split and run along two expressways: I-57 and the Calumet Expressway. Because the "L" utilized skip-stop service at the time of the New Horizons, the Calumet Expressway route and the I-57 route were designated for "A" and "B" trains, respectively.[4][5]

The extension concept was carried over in many subsequent development plans. In the 1995 Transportation System Plan (1973) and the Year 2000 Transportation System Development Plan (1980), the Calumet Expressway route remained unchanged under both plans, but the I-57 route was extended from 119th Street to Vermont Street in Blue Island, Illinois, via the Blue Island branch of the Illinois Central Gulf Railroad (ICG);[5][7][8] the ICG branch is now part of the Metra Electric District.[9] Subsequent plans beginning with the 2010 Transportation System Development Plan (1990) no longer listed the extension to Blue Island.[5][10] The 2020 Regional Transportation Plan (1998) extended the extension alignment to 130th Street via the Bishop Ford Freeway;[11] the Calumet Expressway was renamed for Bishop Louis Henry Ford earlier in 1996.[12]

21st century

[edit]

In 2004, with the support from the Developing Communities Project within the past few years, a non-binding advisory referendum in favor of the Red Line Extension was passed by 39,000 voters (98% of voters) in the 9th and 34th wards.[13][14][15]

After the federal SAFETEA-LU was signed into law in August 2005, the New Starts funding from the Federal Transit Administration (FTA) was earmarked for public transit projects, including the Red Line Extension.[5][16] In order to receive New Starts funding, the project required alternatives analysis, environmental impact statement, preliminary engineering, final design, and construction.[5]

In 2006, the alternatives analysis began with a $3.5 million contract awarded to Parsons Brinckerhoff.[5][17] The CTA considered nine proposed routes along the following corridors: I-57, Halsted Street, the Union Pacific Railroad tracks, Wentworth Avenue, State Street, Michigan Avenue, King Drive, Cottage Grove Avenue/Metra Electric District, and I-94 (Bishop Ford Freeway). In a public meeting hosted on April 10–11, 2007, the CTA reduced the number of potential alignments to three potential corridors: Halsted Street, a Union Pacific line, and Michigan Avenue. Additionally, the CTA explored whether to implement rail rapid transit or bus rapid transit (BRT).[18] In another public meeting in December 2008, extension options were further reduced to either Halsted Street (BRT or elevated rapid transit) or the Union Pacific line (elevated rapid transit).[19] Alternatives analysis concluded in August 2009, with the CTA adopting an elevated rapid transit line via the Union Pacific corridor as the Locally Preferred Alternative (LPA).[5][20][3]

The CTA began drafting the project's environmental impact statement (EIS) after selecting an LPA.[20] In 2011, the CTA received federal funding from the FTA for environmental studies.[5] The draft EIS was published on October 6, 2016. At this time, the CTA had two options for the alignment of the extension: west or east of the Union Pacific tracks.[21][22]

On January 26, 2018, the CTA finalized the extension. The extension will be 5.3 miles (8.5 km) long and comprise four new stations: 103rd, 111th, Michigan, and 130th. Along the Union Pacific corridor, the extension will run west of the tracks between I-57 and 109th Street and then east of the tracks between 109th Street and the Metra Electric line.[23][24] The extension will also parallel I-57 between 95th Street and the Union Pacific tracks as well as the South Shore Line between the Metra Electric line and 130th Street.[22]

On February 10, 2020, the CTA approved a $38.3 million contract with T. Y. Lin International to complete the Final EIS and preliminary engineering of the Red Line Extension.[25][26] In August 2022, the CTA was given a Record of Decision for the extension project after completing the Final EIS.[27][28] In December 2022, the Chicago City Council approved the creation of a tax-increment financing (TIF) district spanning from Madison Street to Pershing Road. The TIF district will send nearly $1 billion in tax revenue over the next few decades to fund the extension.[29] The next year, the federal government promised to commit $2 billion to the extension project.[30] President Joe Biden's proposed 2024 budget, released in March 2024, included $350 million in federal funding for the extension project.[31][32] On August 14, 2024, the CTA awarded a $2.9 billion contract to Walsh-VINCI Transit Community Partners, a joint organization comprising Walsh Group, Vinci Construction, EXP, Systra, and other contractors.[1][33]

On January 10, 2025, 10 days before the Second inauguration of Donald Trump, the outgoing Biden administration signed a full funding grant agreement with the CTA. The agreement confirmed a $1.97 billion grant for the project, which future administrations could not legally claw back.[34][35] That October, at the start of the 2025 United States federal government shutdown, Office of Management and Budget director Russell Vought withheld a combined $2.1 billion for the Red Line Extension and the Red and Purple Modernization Project, citing reports of diversity, equity, and inclusion practices that he described as "unconstitutional".[36][37] In response, Mayor Brandon Johnson considered suing the federal government to unfreeze the funds.[37]

Construction

[edit]

As of the time the draft EIS was published in 2016, construction was originally slated to occur between 2022 and 2026 at the earliest, with the project costing $2.3 billion.[22][26] However, future construction was delayed to between early 2026 and September 2030, the length of the extension slightly increased to 5.6 miles (9.0 km), and the project cost soared to $5.7 billion. Building demolition and utility relocation are currently underway.[2][3]

References

[edit]
  1. ^ a b c Thibault, Matthew (22 August 2024). "50 years in the making, $2.9B Chicago Red Line extension finds contractors". Construction Dive. Retrieved 7 March 2026.
  2. ^ a b Evans, Maxwell (11 April 2025). "Demolition Underway To Make Room For Red Line Extension, Officials Say". Block Club Chicago. Retrieved 11 March 2026.
  3. ^ a b c "Red Line Extension" (PDF). United States Department of Transportation. March 2024. Retrieved 10 March 2026.
  4. ^ a b Garfield, Graham. "New Horizons for Chicago's Metropolitan Area". Chicago-L.org. Retrieved 5 October 2025.
  5. ^ a b c d e f g h i j Garfield, Graham. "Red Line: Dan Ryan branch". Chicago-L.org. Retrieved 5 October 2025.
  6. ^ "Expressways". Encyclopedia of Chicago. Retrieved 5 October 2025.
  7. ^ Garfield, Graham. "1995 Transportation System Plan". Chicago-L.org. Retrieved 7 March 2026.
  8. ^ Garfield, Graham. "Year 2000 Transportation System Development Plan". Chicago-L.org. Retrieved 7 March 2026.
  9. ^ "Metra Purchase of IC Commuter Line Approved". Chicago Tribune. 26 March 1987. Retrieved 7 March 2026.
  10. ^ Garfield, Graham. "Year 2010 Transportation System Development Plan". Chicago-L.org. Retrieved 7 March 2026.
  11. ^ "2020 Regional Transportation Plan" (PDF). Chicago Area Transportation Study. Retrieved 8 March 2026.
  12. ^ "Interstate Identities: Kingery, Bishop Ford, Edens". Chicago: WLS-TV. February 17, 2012. Retrieved March 8, 2026.
  13. ^ Joravsky, Ben (16 February 2006). "The Train That Never Comes". Chicago Reader. Retrieved 8 March 2026.
  14. ^ Lynch, La Risa (9 November 2016). "Extending the Red Line, At Last". South Side Weekly. Retrieved 8 March 2026.
  15. ^ "The Case for Transit-Oriented Development in the Greater Roseland Area" (PDF). University of Illinois at Chicago. October 2005. Retrieved 8 March 2026.
  16. ^ ""New Starts" Transit Projects for Northeast Illinois in SAFETEA-LU". Metropolitan Planning Council. 7 June 2006. Retrieved 10 March 2026.
  17. ^ Scherding, Andre (26 April 2018). "Residents, Experts Weigh In on Proposed Red Line Extension – Fourteen East". Retrieved 10 March 2026.
  18. ^ Fitzsimmons, Emma; Hilkevitch, Jon (11 April 2007). "Red Line extension gets push". Chicago Tribune. Retrieved 10 March 2026.
  19. ^ "Red Line Extension Alternatives Analysis Study" (PDF). Archived from the original (PDF) on 27 August 2017. Retrieved 6 January 2009.
  20. ^ a b "Three extensions approved for Chicago 'L'". Railway Gazette International. 20 August 2009. Retrieved 10 March 2026.
  21. ^ "CTA releases environmental study for Red Line extension". Progressive Railroading. 6 October 2016. Retrieved 10 March 2026.
  22. ^ a b c "Red Line Extension (RLE) Project, Chicago". Railway Technology. 30 October 2016. Retrieved 10 March 2026.
  23. ^ Pathieu, Diane; Holmes, Evelyn (26 January 2018). "CTA announces proposed path for Red Line extension to 130th Street, adding 4 new stations". ABC7 Chicago. Retrieved 10 March 2026.
  24. ^ Wisniewski, Mary (26 January 2018). "CTA determines path for proposed Red Line south extension to 130th Street". Chicago Tribune. Retrieved 10 March 2026.
  25. ^ Yoders, Jeff (11 February 2020). "Chicago's CTA Board Approves $38.3-Million Red Line Extension EIS". Engineering News-Record. Retrieved 11 March 2026.
  26. ^ a b Blumberg, Nick (10 February 2020). "Long-Awaited CTA Red Line Extension Moves Forward With New $38M Contract". WTTW News. Retrieved 11 March 2026.
  27. ^ "CTA completes environmental review for Red Line extension on Far South Side". ABC7 Chicago. 16 August 2022. Retrieved 10 March 2026.
  28. ^ Weinberg, Harrison (16 August 2022). "CTA Red Line Extension project advances to federal funding phase". Railway Track and Structures. Retrieved August 18, 2022.
  29. ^ Evans, Maxwell (December 14, 2022). "Red Line Extension TIF Approved, Sending Nearly $1 Billion To Far South Side Project Over 35 Years". Block Club Chicago.
  30. ^ Spielman, Fran (September 8, 2023). "Feds make $2B commitment to CTA Red Line extension". Chicago Sun-Times. Retrieved October 3, 2025.
  31. ^ Cherone, Heather (March 9, 2023). "Biden Proposes $350M Federal Grant to Fund Far South Side CTA Red Line Extension". WTTW News. Retrieved October 3, 2025.
  32. ^ Struett, David (March 13, 2024). "CTA Red Line extension to get $350 million in Biden's proposed budget". Chicago Sun-Times. Retrieved October 3, 2025.
  33. ^ Liederman, Mack; Evans, Maxwell (14 August 2024). "CTA Approves Massive Contract To Build Red Line Extension As Costs Top $5 Billion". Block Club Chicago. Retrieved 13 March 2026.
  34. ^ "FTA finalizes grant for Chicago's Red Line Extension". Trains Magazine. 10 January 2025. Retrieved 11 March 2026.
  35. ^ Struett, David (January 10, 2025). "Red Line extension funding now certain as CTA, feds sign grant agreement". Chicago Sun-Times. Retrieved October 3, 2025.
  36. ^ Quig, A.D.; Soglin, Talia; Yin, Alice (October 3, 2025). "Mayor Brandon Johnson considering lawsuit as Trump withholds $2.1B from Chicago, including CTA Red Line Extension funds". Chicago Tribune. Retrieved October 3, 2025.
  37. ^ a b Cherone, Heather (October 3, 2025). "Trump Pauses $2.1B for Chicago's Red Line Extension and Other Infrastructure Projects, Citing 'Race-Based Contracting'". WTTW News. Retrieved October 3, 2025.
[edit]