Platform | |||||||||||||
| Chinese name | |||||||||||||
| Chinese | 高村站 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | Intersection of Linshang North Road (林上北路) and Gaocun Boulevard (高村大道), Beijiao Shunde District, Foshan, Guangdong China | ||||||||||||
| Coordinates | 22°56′50.96″N 113°11′20.22″E / 22.9474889°N 113.1889500°E | ||||||||||||
| Operated by | Foshan Metro Operation Co., Ltd. | ||||||||||||
| Lines | Line 3 South section | ||||||||||||
| Platforms | 2 (1 island platform) | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
| Structure type | Underground | ||||||||||||
| Accessible | Yes | ||||||||||||
| Other information | |||||||||||||
| Station code | F314 | ||||||||||||
| History | |||||||||||||
| Opened | 28 December 2022 | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Gaocun station (Chinese: 高村站; pinyin: Gāocūn Zhàn; Cantonese Yale: Gōuchyūn Jaahm) is a station on Line 3 of Foshan Metro, located in Foshan's Shunde District.[1] It opened on 28 December 2022.[2][3]
Station layout
[edit]The station has an island platform under Linshang Road.[4]
| G | - | Exits B, C, D |
| L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Security Facilities |
| L2 Platforms |
Platform 1 | |
| Island platform, doors will open on the left | ||
| Platform 2 | 3 towards Shunde College Railway Station (Beijiao Park) | |
Platform
[edit]The station has an island platform located under Linshang Road. In addition, there is a double storage line on the west side of the station, which can be used to turnback for intermediate station terminating trains. At the same time, the track also extends westward into the Beijiao Stabling Yard as an entry and exit line.[5] Some intermediate terminating trains will withdraw from service and return to the Beijiao Stabling Yard after the clearance of passengers on Platform 1. When a typhoon hits and requires the suspension of the open-air section, all trains departing from the north will turnback at this station, serving as the temporary terminus.
Entrances/exits
[edit]The station has 3 points of entry/exit, located on the southeast and northwest sides of Linshang North Road. Exit B is accessible via elevator.[1]
History
[edit]On 11 December 2019, the station topped out.[6] On 29 September 2020, the open-cut section between this station and Beijiao station (now Beijiao West Railway Station metro station) successfully topped out.[7] On 15 January 2021, construction of the station was completed, making it the first completed station on Line 3.[8]
On 29 August 2021, the double line tunnel between this station and Beijiao New Town station (now Beijiao Park station) broke through.[9] On 10 June 2022, the section from this station to Beijiao Park station was short tracked, and the rail laying was completed two days later. On this day, the initial section of Line 3 has completed track laying.[10]
On 28 December 2022, the station opened with the opening of Line 3.[11]
References
[edit]- ^ a b "高村" [Gaocun]. Foshan Metro (in Simplified Chinese). Foshan Metro.
- ^ 北青网 (28 December 2022). "广东佛山地铁3号线首通段正式开通运营" [The first section of Guangdong Foshan Metro Line 3 officially opened for operation] (in Simplified Chinese). Retrieved 21 July 2024.
- ^ "Foshan opens metro Line 3". Metro Report International. 29 December 2022. Archived from the original on 8 May 2024. Retrieved 21 July 2024.
- ^ 梁焯贤 (28 December 2019). "佛山地铁3号线、2号线一期站点详细位置公布!最新进展" [The detailed locations of Foshan Metro Line 3 and Line 2 Phase 1 stations have been announced! Latest progress]. Foshan News Network (in Simplified Chinese). Archived from the original on 26 June 2022 – via Foshan Municipal People's Government.
- ^ "直击现场|探营佛山地铁三号线高村站" [Live on the scene - Exploring Gaocun Station on Foshan Metro Line 3]. Foshan Rail Transit Bureau (in Simplified Chinese). 21 October 2021. Archived from the original on 30 June 2022. Retrieved 19 September 2025.
- ^ 李传智 (11 December 2019). "在建佛山地铁三号线有新进展 高村站主体结构顺利封顶" [New progress has been made on the construction of Foshan Metro Line 3, with the main structure of Gaocun Station successfully topped out.]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 30 June 2022.
- ^ 李传智 (30 September 2020). "佛山地铁三号线高北明挖区间顺利封顶" [The Gaobei open-cut section of Foshan Metro Line 3 has been successfully topped out]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 30 June 2022.
- ^ 欧阳志强 (15 January 2021). "佛山地铁三号线首个车站全面完工 明年首通段通车" [The first station of Foshan Metro Line 3 has been fully completed and the first section will open to traffic next year.]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 30 June 2022.
- ^ 欧阳志强 (31 August 2021). "佛山地铁3号线首通段全线贯通" [Foshan Metro Line 3 first section fully broke through]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 30 June 2022. Retrieved 19 September 2025.
- ^ 陈飞龙 (14 June 2022). "最新进展!佛山地铁3号线首通段正式实现全线轨通" [Latest progress! The first section of Foshan Metro Line 3 has officially completed full track connection]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 14 June 2022. Retrieved 19 September 2025.
- ^ 陈飞龙 (24 December 2022). "官宣!佛山地铁3号线首通段12月28日正式开通" [Official Announcement! The first section of Foshan Metro Line 3 officially opened on December 28th] (in Simplified Chinese). Southern Metropolis Daily. Archived from the original on 24 December 2022. Retrieved 19 September 2025.
External links
[edit]- Station information: 高村