Guicheng station

Guicheng

桂城
Foshan Metro
Line 3 platform
Chinese name
Chinese桂城站
Transcriptions
Standard Mandarin
Hanyu PinyinGuìchéng Zhàn
Yue: Cantonese
Yale RomanizationGwaisìhng Jaahm
JyutpingGwai3sing4 Zaam6
General information
LocationIntersection of Nangui Road (南桂路) and Nanhai Boulevard (南海大道), Nanhai District, Foshan, Guangdong
China
Coordinates23°2′2.760″N 113°8′8.844″E / 23.03410000°N 113.13579000°E / 23.03410000; 113.13579000
Operated byFoshan Railway Investment Construction Group Co. Ltd.
Guangzhou Metro Co. Ltd.
Lines     Guangfo line
     Line 3
South section
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
Platform levels2
AccessibleYes
Other information
Station codeGF11 F324
History
Opened
  •      Guangfo line: 3 November 2010; 14 years ago (2010-11-03)
  •      Line 3
    South section: 23 August 2024; 13 months ago (2024-08-23)
Services
Preceding station Foshan Metro Following station
Chao'an Guangfo Line Nangui Lu
towards Lijiao
Xiyue Line 3
South section
Zhen'an
Location
Map

Guicheng Station (Chinese: 桂城站; pinyin: Guìchéng Zhàn; Cantonese Yale: Gwaisìhng Jaahm) is an interchange station between the Guangfo line and Line 3 of the Foshan Metro. [1] It is located at the underground of the junction of Nanhai Avenue North (南海大道北) and Nangui Road (南桂路) in Guicheng Subdistrict, Nanhai District,[2] Foshan, China. The station is situated at the central business district of Nanhai District, near the headquarters of Nanhai municipal government. Construction started in 2007 and was completed on 3 November 2010. The Line 3 station opened on 23 August 2024.[3][4]

Station structure

[edit]

Platform layout

[edit]

The station has three underground floors. The ground level is the exit, and it is surrounded by Nangui East Road, Nanhai AVenue and other nearby buildings. The first floor is the concourse, the second floor is the Guangfo line platform and the mezzanine of the Line 3 lower concourse, and the third floor is the Line 3 platform.

G - Exits A, B, D1, D2, E
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities
L2
Platforms
Platform 2 arrow for L  Guangfo  towards Xincheng Dong (Chao'an)
Island platform, doors will open on the left
Platform 1  Guangfo  towards Lijiao (Nangui Lu) arrow for R
Buffer Area Stairs and elevators towards concourse and  3  platforms
Station Equipment
Mezzanine Transfer level between  Guangfo  and  3  platforms
L3
Platforms
Platform 3 arrow for L  3  towards Zhongshan Park (Xiyue)
Island platform, doors will open on the left
Platform 4  3  towards Shunde College Railway Station (Zhen'an) arrow for R

Concourse

[edit]

The concourse is located on the first basement floor, which is an eccentric T-shaped concourse shared by Guangfo line and Line 3. The Line 3 section is north-south, and the Guangfo line section is east-west. The Line 3 section is divided into two parts, north and south.

The center of the Guangfo line part and the central southern part of Line 3 towards the north, and the northern part to the west are divided into fare-paid areas, where elevators, escalators, and stairs are installed for passengers to access the platforms. On the east side of the Guangfo line concourse, a separate fare-paid area is divided for passengers using the elevator connecting to the Guangfo line platform. As for the dedicated elevator connecting to the Guangfo line platform, since the elevator door is located on the east side of the non-paid area of the Guangfo line concourse, station staff must be requested for assistance when using it.

The station is equipped with a 7-Eleven convenience store and a bakery, as well as ticket machines, card recharge machines and other facilities.

Transfer

[edit]

During the construction of Guangfo line, the transfer node and part of the lower level for the Line 3 platforms were reserved. When Line 3 was constructed, stairs were set up on both sides of the Guangfo Line platform to connect the lower transfer mezzanine, and a set of double escalators are set up at the transfer mezzanine to connect to the platform of Line 3. Considering the capacity gap between Guangfo line and Line 3, the interchange platform is currently only used in the direction from Guangfo line to Line 3, and its escalators are also set up to go to the platform of Line 3 in one direction, while the transfer of Line 3 to the Guangfo line requires transferring through the concourse.[5]

Platform

[edit]

The Guangfo line has an underground island platform, located underground on the south side of Nangui East Road. Line 3 also has an island platform located underground on Nanhai Avenue. The two-line platforms form roughly a "T" shape, with the Guangfo line above and Line 3 below.

The toilet and nursery of the station are located at the northern end of the Line 3 platform.

In addition, during the construction of Guangfo line, the turnout location and related civil structures to the connecting line of Line 3 have been reserved in the southwest quadrant, and the follow-up works of the connecting line have been permanently shelved due to the design adjustment of Line 3.

Entrances/exits

[edit]

The station has 5 points of entry/exit. In the early days of the Guangfo Metro, this station only had Exits B and D, both located on the south side of Nangui East Road, and passengers on the north side of the road had to cross the road to access the station until Exit D2 on the north side was opened on 28 January 2016.[6] The original Exit D was reassigned to Exit D1 for distinction due to the opening of Exit D2. Exit A was opened on 2 September 2017.[7]

After the opening of Line 3, in addition to the new Exit E on the east side of Nanhai Avenue, Exits A, B and D2 are all connected to the non-paid area of Line 3, so the signs leading to the above three entrances/exits of the Guangfo line and Line 3 concourses are marked as "Gate 1" and "Gate 2" respectively for distinction.

  • A: Nanhai Boulevard
  • B: Nanhai Boulevard, East Nangui Road, Nanhai District People's Government, Nanhai Branch of Foshan Public Security Bureau Wheelchair user access
  • D1: Nangui East Road
  • D2: Nangui East Road Wheelchair user access
  • E: Nanhai Boulevard Wheelchair user access

Exit B is accessible via stairlift and Exits D2 and E are accessible via elevators.

[edit]

History

[edit]

In 2002, the direction of the Guangfo Metro was preliminarily determined, and the station was determined to be one of the intermediate stations in the Foshan section of the Guangfo Metro and there was also a transfer to the future planned Foshan Metro Line 3.

The station was the first to start construction on 28 June 2007.[8] On 31 July 2008, the construction site of the station suddenly subsided, causing the wall of the station site to collapse about 40 meters, but fortunately there were no casualties.[9]

On 28 and 29 October 2010, the station was opened to citizens in Guangzhou and Foshan for test rides along the initial section of the Guangfo Metro.[10] At 14:00 on 3 November, the station opened with the opening of the Guangfo Metro.[11]

The enclosure construction of the Line 3 station began at the end of May 2017,[12] and the main structure topped out on 30 November 2019.[13] The Guangfo Line station started the construction of the Line 3 access project in early 2023. On 23 August 2024, the station opened from the first train of Line 3.[14][15]

References

[edit]
  1. ^ 廣佛地鐵共設9座換乘站 44車站自動扶梯招標 (in Simplified Chinese). 2008-10-07. Archived from the original on 2014-02-22.
  2. ^ "桂城5大地铁站点月底全部封闭施工" [All five major subway stations in Guicheng will be closed for construction at the end of the month] (in Simplified Chinese). Archived from the original on 2011-07-07. Retrieved 2009-04-02.
  3. ^ 李传智 (2024-08-20). "官宣!佛山地铁3号线在建段将于本周五开通" [Official announcement! The under-construction section of Foshan Metro Line 3 will open this Friday]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-08-20. Retrieved 2024-08-21.
  4. ^ 刘佳伦 (2024-08-23). "佛山3号线开通首日,人气如何?南方+记者带你现场直击" [How popular is Foshan Line 3 on its first day of operation? Nanfang+ reporter takes you to the scene]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-08-23. Retrieved 2024-08-24.
  5. ^ 周钊泷 (2024-08-21). "超丝滑!广佛线换乘地铁3号线,1分钟搞定" [Super smooth! Transfer from Guangfo Line to Metro Line 3 in 1 minute]. Nanhai Media (in Simplified Chinese). Archived from the original on 2024-08-21. Retrieved 2025-09-21.
  6. ^ 柯凌娜 (2016-01-29). "广佛线4个地铁站口正式开通 市民商家齐点赞" [Four subway station entrances on the Guangzhou-Foshan Line have officially opened, drawing praise from citizens and businesses.]. Pearl River Times (in Simplified Chinese). Archived from the original on 2016-04-03. Retrieved 2025-09-21 – via Sina News.
  7. ^ 李传智 (2017-09-03). "广佛线桂城站A出入口启用" [Entrance A of Guicheng Station on the Guangzhou-Foshan Line has been opened]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2023-05-16. Retrieved 2025-09-21 – via Sina News.
  8. ^ 宋苑丹 (2007-06-28). "广佛地铁今日三处齐动工 预计2010年可开通首段" [Construction of the Guangzhou-Foshan Metro started today at three locations; the first section is expected to open in 2010.]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 2017-03-05.
  9. ^ 王广永 (2008-08-01). "广佛地铁桂城站施工点" [Construction site of Guicheng Station of Guangzhou-Foshan Metro]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2023-05-16. Retrieved 2025-09-21 – via Sina News.
  10. ^ 熊薇 (2010-10-29). "广佛地铁昨日开始试乘,亚运期间"逢包必检"" [The Guangzhou-Foshan Metro started trial service yesterday, and all bags will be checked during the Asian Games.]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 2023-05-11. Retrieved 2025-09-21 – via Sina News.
  11. ^ 杨进 (2010-11-04). "17万人挤爆广佛线 西朗站被迫一度暂停换乘" [170,000 people packed the Guangzhou-Foshan line, forcing Xilang Station to temporarily suspend transfers.]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2021-02-02. Retrieved 2025-09-21 – via Sohu.
  12. ^ 倪玉洁 (2017-05-26). "佛山地铁三号线桂城站动工 28日起车辆需改道通行" [Construction of Guicheng Station on Foshan Metro Line 3 has begun. Traffic will be diverted starting on the 28th.]. Pearl River Times (in Simplified Chinese). Archived from the original on 2023-05-16. Retrieved 2025-09-21 – via Sina News.
  13. ^ 区辉成 (2019-12-19). "佛山地铁3号线19个站点封顶" [19 stations on Foshan Metro Line 3 have been topped out]. Pearl River Times (in Simplified Chinese). Archived from the original on 2023-05-16.
  14. ^ 周明谦 (2024-08-23). "每天施工三四个小时,只为了减少对市民出行的影响丨直击3号线" [Construction is ongoing for three to four hours a day, just to reduce the impact on public transportation.]. Foshan News Media Center (in Simplified Chinese). Archived from the original on 2024-08-23. Retrieved 2025-09-21.
  15. ^ 邓嘉慧 (2024-08-23). "桂城站:"新站点开通我可以多睡半小时了!" | 直击3号线" [Guicheng Station: "The new station has opened and I can sleep for half an hour longer!" | Direct to Line 3]. Foshan News Media Center (in Simplified Chinese). Archived from the original on 2024-08-23. Retrieved 2025-09-21.
[edit]